Fengxiang Wetland Park Project of Meishe River in Haikou City

  • Owner's name:Beijing Sande Environmental Engineering Co., Ltd
  • Project type: Equipment Supply + Operation Maintenance
  • Scale:Water Quality Improvement of 5000m_/d
  • Particular year:2017年

Project Profile:

At the beginning of 2017, Sander Group joined Else Environmental Protection to obtain a large list of water body restoration of Meishe River in Haikou City. Greenhouse Technology participated in it. From Spring Equinox to Autumn Equinox, the comprehensive project of water body treatment of Meishe River was basically completed. The Meishe River, which has been plagued by black and odorous water for many years, is restoring its original clarity. The treated Meishe River has become a National Water Conservancy Scenic Spot and river with beautiful environment. The model of lake ecological restoration project.

Project introduction


Project background

At the beginning of 2017, Sander Group, in conjunction with Else Environmental Protection, obtained a large list of water body restoration of Meishe River in Haikou City, in which Greenhouse Science and Technology participated. From the Spring Equinox to the Autumn Equinox, the comprehensive project of water body control of Meishe River was basically completed. The Meishe River, which has been plagued by black and odorous water for many years, is restoring its original clarity. The treated Meishe River has become a beautiful country with beautiful environment. Family-level Water Conservancy Scenic Spots and river and lake ecological restoration project model.


Project overview

    According to the contract signed with Sander Environmental Engineering Co., Ltd., Lvheng Technologies provides a set of GreenEver high-efficiency unpowered sewage purifier and auxiliary equipment for Fengxiang Wetland Park, a Meishe River project, to treat 5000m < sup > 3  daily as the pretreatment process of wetland water source. According to the contract requirements, the equipment arrived at the site within 10 days, and then completed all installation and commissioning within 10 days. All the staff of Lvheng Science and Technology participating in the construction of the project work overtime and strictly guarantee all aspects of quality to meet the owners'requirements. All the equipments installed and completed are harmoniously integrated into the natural environment of the wetland park, which significantly improves the quality of the wetland water source. It has made a contribution to the first water conservancy project in Haikou City which has won the honor of National Water Conservancy Scenic spot.

 

Water quality comparison before and after treatment

1554968503115544.jpg

 

Leadership concern

1554968722134547.jpg

Hainan Provincial Party Secretary and Provincial Governor Visit Fengxiang Park

 

Sweeping Pays Attention to Us
Welcome to inquire 010-57780008
  • ABOUT US
  • NEWS CENTER
  • Technology and Application
  • ENGINEERING CASE
  • JOIN GREEN
Copyright Beijing Green Heng Technology Co., Ltd Website Record No:Beijing ICP No. 14042383