Longwangmiao River Water Treatment Facility Project in Tangshan City, Hebei Province

  • Owner's name:Tangshan Douhe River Management Office
  • Project type: Equipment Supply + Operation Maintenance
  • Scale:2500m3/d
  • Particular year:August 2018

Project Profile:

The project of Longwangmiao River Water Treatment Facility in Tangshan City deals with urban inland river water. An integrated water intake pump station with mechanical fences is set up in the river. After the water intake pump is lifted to the treatment equipment, the sewage is discharged up to the standard after treatment.

Project introduction

Engineering survey


    The project of Longwangmiao River Water Treatment Facility in Tangshan City deals with urban inland river water. An integrated water intake pump station with mechanical fences is set up in the river. After the water intake pump is lifted to the treatment equipment, the sewage is discharged up to the standard after treatment.



Technological process



Sweeping Pays Attention to Us
Welcome to inquire 010-57780008
  • ABOUT US
  • NEWS CENTER
  • Technology and Application
  • ENGINEERING CASE
  • JOIN GREEN
Copyright Beijing Green Heng Technology Co., Ltd Website Record No:Beijing ICP No. 14042383